How far under the target pitch rate is close enough, as a fraction.
A pitch rate is built on a viability estimate, a round-number cell count
printed on a pack, and a volume the brewer hasn't measured yet. 0.72 against
a 0.75 target is within the model's own error, so we don't flag it. 10 %
under is inside the noise.
How far under the target pitch rate is close enough, as a fraction.
A pitch rate is built on a viability estimate, a round-number cell count printed on a pack, and a volume the brewer hasn't measured yet. 0.72 against a 0.75 target is within the model's own error, so we don't flag it. 10 % under is inside the noise.