Split a total water requirement into strike and sparge.
Strike water is mash thickness × grain, and the sparge makes up the rest.
No-sparge and BIAB profiles mash in the full volume, so strike takes
everything. If the requested thickness would need more water than the batch
calls for, strike is capped at the total and the sparge goes to zero.
Split a total water requirement into strike and sparge.
Strike water is
mash thickness × grain, and the sparge makes up the rest. No-sparge and BIAB profiles mash in the full volume, so strike takes everything. If the requested thickness would need more water than the batch calls for, strike is capped at the total and the sparge goes to zero.