@beerwright/core
    Preparing search index...

    Function planDecoctions

    • Size every decoction in a schedule, carrying the mash from one to the next.

      Each pull is sized against the mash as the previous pull left it, minus the water that boiled away and at the temperature it actually reached. Most calculators that offer a triple decoction size every pull against the original mash, which overstates the later pulls. By the third one the tun has lost 2–3 L and its thickness has changed.

      Parameters

      Returns DecoctionPlan